Project leader: City of Rab |
Rab Airport |
CRO DEU ITA BACK |
Estimated value of the project: EUR 14,000,000 Location: Island of Rab, Mišnjak – Ownership: City of Rab, Republic of Croatia and private Significance of the project The project will connect the island of Rab, an important tourist destination, further develop the tourism industry on the island and in the wider region. The Rab Airport project is based on the Air Traffic Development Strategy of the Ministry of Maritime Affairs, Transport and Infrastructure and it has been approved by the Government of the Republic of Croatia. The project involves the following construction activities Based on the micro-site conditions and topographic characteristics, the runway has been designed at a length of 1,700 m, 45.0 m wide, with 7.0 m shoulder width. According to the preliminary design, in addition to the terminal building, which would meet all international flight requirements in compliance with ICAO and IATA standards, a bus station would also be developed, with a car park with the capacity of 500 vehicles, in addition to the apron and hangars. Realization model Open negotiating options. Developed documents Physical planning documents:
Project documentation:
Contact Zvonko Puljar Matić, Head Trg Municipium Arba 2, 51280 Rab |
|