Energo-Campus Power Plant

Primorje-Gorski kotar County
Hrvatski English
 
Type of the project: Energetics City of Rijeka
back
The leader of the project: City of Rijeka and Energo Ltd. with partners: University of Rijeka and Hospital Centre Rijeka
     
 

Location

University of Rijeka campus

Ownership

Buildings of the former military barracks on Trsat have been awarded to the City of Rijeka with a defined purpose, i.e. to be used for the Campus and by the University Hospital. The City of Rijeka and the University of Rijeka concluded an Agreement on Establishing Building Rights.

Estimated value of the project: EUR 5,700,000

Significance of the project

By utilizing waste and renewable energy sources, as well as due to new technological equipment, the electric power plant will deliver electrical power and heating (later cooling as well) to the University Campus, the Clinical Hospital Centre and the future University Hospital.

The project involves the following construction activities

  • Construction of a power plant having the area of 575 m² and the overall built-up area of 1,150 m²,
  • Construction of reduction measurement station,
  • Equipment for the power plant with two generators and five heating boilers.

Realization model

Open negotiating possibilities (loan, equipment lease, etc.).

Developed documents

Physical planning documents:

  • Project is aligned with physical planning documents.

Construction permits:

  • Building permit has been obtained.

Contact

Sanjin Kirigin, Manager
Energo Ltd.
Dolac 14, 51000 Rijeka, Croatia, Croatia
Phone: +385 51 353 006
E-mail: sanjin.kirigin@energo.hr
Web: www.energo.hr

Map

Simulation

Simulation

Regional Development Agency Porin Ltd.One Stop Service Centre
Phone: +385 51 634 330 • Fax: +385 51 634 340 • E-mail: rraporin@porin.hr • Web: www.porin.hr